Custom Burner Systems

Tailored industrial burner systems from 30 kW to 12,000 kW with multi-fuel capability and low-NOx combustion. Engineered to your fuel composition, firebox geometry and Australian licence limits, supplied with full FAT documentation and on-site commissioning.

Beschrijving

Custom Burner Systems Engineered for Australian Process Industries

Ever-power designs and manufactures custom burner systems tailored to the exact thermal load, fuel mix and emissions envelope of each plant. Power ratings cover 30 kW for compact heat treatment up to 12,000 kW for large refinery and petrochemical duty, with multi-fuel capability across natural gas, LPG, fuel oil, refinery off-gas and specialised industrial fuels. Every burner package is built from validated CFD models, hardware tested at our combustion lab, and shipped with full documentation aligned to AS/NZS 3814 and AGA approval pathways.

Ever-power custom burner systems installed on industrial process heater
Custom burner flame profile inside refractory-lined process furnace

What Makes a Custom Burner the Right Choice

Off-the-shelf burners often force operators to compromise on flame length, heat distribution or fuel flexibility. A custom burner system removes those compromises. Our engineering team starts with your process drawing, fuel analysis and emissions target, then sizes the throat, register, atomiser and igniter set as a matched assembly. The result is a burner that drops into existing refractory openings, holds turndown across the operating envelope and meets jurisdictional NOx limits without bolt-on abatement.

Tailored Flame Geometry
Short bushy flames for shell boilers, long pencil flames for tubular reformers, or flat radiant fields for cracking furnaces.
30 kW to 12,000 kW
Full coverage from laboratory pilot units up to large utility boilers, with turndown ratios of 10:1 typical and 20:1 available.
Low-NOx by Design
Internal staging and lean premix architectures deliver NOx down to 30 mg/Nm3 without flue gas recirculation, lower with FGR.
Multi-Fuel Capable
Natural gas, LPG, propane, diesel, heavy fuel oil, biogas and process off-gas, including dual-fuel and tri-fuel arrangements.

Custom Burner System Specifications

Parameter Standard Range Custom Option
Thermal Capacity 30 to 12,000 kW Up to 25 MW on multi-burner blocks
Turndown Ratio 10:1 Up to 20:1 with modulating control
NOx Emissions (gas) ≤ 80 mg/Nm3 ≤ 30 mg/Nm3 with internal staging
CO Emissions ≤ 50 mg/Nm3 ≤ 20 mg/Nm3
Operating Pressure 2 to 50 kPa Up to 0.6 MPa for high-pressure duty
Air Preheat Tolerance Ambient to 300 °C Up to 550 °C with high-temp register
Ignition Direct spark, gas pilot Continuous interrupted pilot, UV scan
Flame Detection UV or ionisation Self-checking dual UV with BMS
Approvals CE, ISO 9001 AS/NZS 3814, AGA, FM, ATEX

Burner Configurations We Engineer

Process Burners

For fired heaters, reformers and cracking furnaces in refining and petrochemicals.

Package Boiler Burners

Watertube and firetube duty up to 80 t/h steam generation.

Duct Burners

Inline supplementary firing for HRSG and cogeneration trains.

Incinerator and RTO Burners

High-turndown burners for thermal oxidisers, RTOs and waste destruction units.

Flare and Pilot Systems

Reliable ignition and stable pilots for emergency relief flares.

Kiln and Calciner Burners

Cement, lime, alumina and mineral processing duty with multi-fuel handling.

Engineered burner register and atomiser assembly for petrochemical fired heater

Engineering Workflow from Enquiry to Commissioning

Stage Deliverable Typical Lead Time
Process review and fuel analysis Heat balance, datasheet 5 to 10 days
CFD modelling and flame shaping Flame envelope, NOx prediction 2 to 3 weeks
Mechanical design and approval GA drawings, BOM, P&ID 2 weeks
Fabrication and FAT Witness firing report 8 to 14 weeks
Site commissioning Tuning, emissions verification 3 to 7 days on site

Why Australian Operators Choose Ever-power

Two Decades of Combustion Engineering
More than 4,000 burner installations commissioned across petrochemicals, refining, food, paper and minerals processing.
In-house CFD and Hot Lab
Validated combustion models and a dedicated test rig let us de-risk every flame profile before fabrication.
Local Compliance Knowledge
EPA Victoria, EPA NSW, DWER WA and Queensland licence conditions are addressed at the design stage.
Lifetime Spare Parts Support
Burner tips, atomisers, igniters and flame scanners stocked for legacy and current series.

For an introduction to our broader thermal-treatment portfolio, visit our company homepage and explore the full range of oxidiser and combustion technology.

Australian Project Highlight

Geelong Specialty Chemicals Plant, Victoria

A specialty chemicals manufacturer near Geelong needed to retrofit an ageing fired heater that could no longer meet the EPA Victoria NOx licence limit of 100 mg/Nm3. Ever-power supplied a custom 4,200 kW process burner with internal staging and dual-fuel handling for natural gas and refinery off-gas.

NOx Reduction
62%
Fuel Saving
7.4%
Commissioning
5 days
Uptime since
99.6%

Frequently Asked Questions

How long does it take to engineer a custom burner system?

From a complete enquiry pack we deliver a firm proposal within 10 working days. Detailed engineering, fabrication and FAT typically run 14 to 18 weeks for power ratings up to 12,000 kW. Larger multi-burner blocks may extend to 22 weeks.

Can a custom burner be retrofitted into an existing furnace opening?

Yes. We design the burner block and mounting flange to match your existing refractory throat and tile. Site survey drawings, photographs and a thermal scan of the firebox are usually enough to confirm a drop-in fit.

What NOx levels are achievable on natural gas?

Standard low-NOx designs achieve 60 to 80 mg/Nm3 at 3% O2 reference. Internal staging brings figures to 30 to 40 mg/Nm3. With external flue gas recirculation, single-digit NOx in the 20 mg/Nm3 range is achievable.

Do you support dual-fuel and tri-fuel arrangements?

Yes. Common pairings include natural gas with diesel back-up, natural gas with refinery off-gas, and natural gas with biogas. Switchover can be hot or cold, automatic or manual, depending on plant philosophy.

Are your custom burner systems certified for the Australian market?

All packages can be supplied with AS/NZS 3814 compliant gas trains and AGA-listed components. Burner management systems are built to AS 3814 and IEC 61508 SIL2 where required.

What spare parts should we hold on site?

A recommended spares list is supplied with every order. Critical items include the gas tip set, oil atomiser cap, ignition electrode, UV flame scanner and igniter transformer. Most plants stock one full set per burner.

Do you provide commissioning support in Australia?

Yes. We dispatch a combustion specialist for site supervision, light-off, tuning and emissions verification. Remote support is also available via secure VPN to the burner management system.

Talk to a Combustion Specialist

Ready to specify your custom burner system?

Send your fuel analysis, furnace drawings and emissions target. You will receive a written technical response within five working days, including indicative heat release, flame envelope and budget pricing.